So, almost everything is hooked up now. There are a few plumbing things that have to be resolved and 3 connections have to be made in the control panel. I wired up all the thermocouples today to the control system and re-plumbed one of the outlets on my pump. About 5 months after I started, it's finally coming together.
3 comments:
When do I get to go buy ingredients....
Soon, very soon. Have to program the controller and run some water batches and then we should be good to go!
Hi Andrew,
Awesome system you have designed and built. I am in the process of building an automated system and while doing research I ran across your website. Rather than reinvent the wheel I was curious if you might be willing to share some of your design plans and schematics.
Thanks
Post a Comment