Banner

Sunday, January 2, 2011

Here's a little peak at the brewery...Happy New Year!

So, almost everything is hooked up now. There are a few plumbing things that have to be resolved and 3 connections have to be made in the control panel. I wired up all the thermocouples today to the control system and re-plumbed one of the outlets on my pump. About 5 months after I started, it's finally coming together.



3 comments:

Unknown said...

When do I get to go buy ingredients....

Andrew Lowell said...

Soon, very soon. Have to program the controller and run some water batches and then we should be good to go!

Lucky Star said...

Hi Andrew,
Awesome system you have designed and built. I am in the process of building an automated system and while doing research I ran across your website. Rather than reinvent the wheel I was curious if you might be willing to share some of your design plans and schematics.

Thanks